- All Factory Installed Inumescent Seals are for the protection of the jamb only.
Any inumescent seals required for the door to be installed must be provided and
installed. All McFarland 60 and 90 minute doors have all required seals factory
installed and require no additional seals.
- Assemble Jamb - Attach head to top of Jamb using 2" - #10 sheet metal screws -
place screws 1" from both edges and 3" maximum on center. Pre-drill pilot holes
Jamb depths - 6-1/8" - 8" Required 3 screws
8-1/8" - 11" Required 4 screws
11-1/8" - 11 3/4" Required 5 screws
- Install jamb in wall - use 2" #10 sheet metal screws. Place Jamb in wall and shim
tight. Check for square and plumb before applying screws - screw tight to stud as
follows: 2 rows of screws, 1 - 9/16 from each edge, 2" from each en and maximum of
12" on center. IE-A 7' Jamb leg would require 16 screw drill pilot holes
at a slight angle to ensure solid attachment to stud. DO NOT FILL screw holes
until installation (including Door) is complete and functional.
- Install Hinges - Pre-drill all screw holes and screw hinges in tight, using 2" #12
sheet metal screws.
- Install lock strike (other than rim panic). Install provided metal dust box in strike
hole and screw through back of box to stud. Pre-drill strike screw holes and install
strike using 2" #12 sheet metal screws.
For Rim panic - surface apply using 2" sheet metal screws.
- Hang Door - checking for square and plumb - Adjust as necessary.
- Apply casing with, minimum 1/2" longer than casing thickness, nails.
- Apply any necessary seals.
- Fill and sand any exposed screw holes.